Eric’sons supplies DuraTrench for new Boeing T7 “Red Hawk” Manufacturing Plant

Case Studies, Featured

It was exciting to be a part of a manufacturing project for Boeing, a new aircraft that supports the US Air Force, and with such heritage.

Over 600ft of 12″ trench drain on extreme duty frame and 14″ wide DIN class F grate was specified and installed inside the facility.

Smooth radius inverts channel sections were shipped fully assembled ready to be installed in long 8ft sections, with factory attached plywood tops, end caps & outlets, and all fabrications done at the factory too.

Depths and slopes are built per the designers requirements. These features make DuraTrench a great improvement over cast in place designs.

, , , , , ,